The development consists of six blocks comprising a 41 storey tower, a 35 storey tower, a 27 storey tower, a 24 storey tower and 2 low rise blocks over a large single storey basement. The development will accommodate 901 number residential units. Read more...
This is a current ongoing project that entails the construction of 16 number townhouses and 4 number RC blocks. Block A comprises the 16 number townhouses. Blocks B, C & D are eight storey low rise RC blocks and Block E is an eighteen storey high rise RC block. Read more...
This is a current ongoing project that entails the construction of the Groundworks and Reinforced Concrete high rise frames to two residential blocks. Block B1 is a 15 storey RC Frame and Block B2 is a 22 storey RC Frame. Read more...
Construction of RC Groundworks and RC Frames to Blocks A, B, C/E, D and F. Under-slab and site-wide drainage and services, road construction and hard landscaping works. Read more...
The project entailed the construction of a residential/commercial mixed use scheme comprising Groundworks, RC Basement & Substructures and RC Frames to Blocks 1-8, a large shared RC podium transfer slab over the basement with eight RC Cores and Frames... Read more...
The project entailed the construction of two new build office buildings situated centrally in Reading comprising an undercroft basement, podium slab and 8 storey buidings above. Read more...
Construction of RC Groundworks and RC Frames to Blocks P, Q, N1 and N2. External Works and hard landscaping to the Link Roads for the National Blood Service offices, Montrose Square and Colindale Station concourse works. Read more...
Abbey Mills Shaft F Internal Structures consisted of over 6600m3 of reinforced concrete. 3100m3 of that forming the main 1m thick spine walls. 70m in height from pit bottom. The RC H Shaped spine walls consisted of an 8m x 8m central core. Read more...
Construction of a waterproof reinforced concrete double storey basement extension to an existing Grade II listed terraced town house in central London, including underpinning and the lowering of the existing... Read more...
Principle Contractor Project incorporating the construction of a single storey sheet piled basement, piled foundations to apartment blocks, foundations to terraced houses and associated archaeological, enabling and demolition works. Read more...
The project entailed the construction of a residential and commercial mixed used scheme comprising 133 number residential units, in 2 number six storey blocks of private flats and 2 number six storey blocks of shared ownership/rented, and I number commercial block. Read more...
Remediation of the existing ground followed by the construction of 3 number 9 storey reinforced concrete frames and 1 number 6 storey reinforced concrete frame parallel to the London Underground railway tracks adjacent to Wembley Park Station. Read more...
The project entailed the construction of a residential/commercial mixed use scheme comprising groundworks, a single storey reinforced concrete basement and a ten storey reinforced concrete frame. Read more...
A civil engineering project for the construction of a new White Water Centre on a brown field site in the Lee Valley, Broxbourne, Hertfordshire. The new White Water Rafting and Canoe Centre formed part of the London Olympics, 2012. Read more...
The project entailed the construction of 5 number blocks of terraced housing and 2 number blocks of 6 storey low rise reinforced concrete frames forming 36 number houses and 26 number flats. Read more...
This is a current project that entails the construction of 5 reinforced concrete frames, 3 of which are constructed from a podium transfer slab, spanning a single storey basement car park. The development consists of 360 apartments, commercial space and associated amenities. The project runs from November 2016 to April 2018 and is valued at £15M. Read more...
The historic Farmiloe Building in the heart of the City of London is being converted and extensively enlarged by this innovative project Read more...
Modebest team take part in demanding cycle run from Clapham Common to Brighton in aid of Centrepoint Read more...
Modebest Builders are proud to be supporting the BBC DIY SOS programme as they build a brand-new home for the Dale Youth Boxing Club. Read more...
Modebest is proud to announce that we have constructed bespoke brand-new premises which we have called ‘MOY HOUSE’. Read more...
Modebest is moving to brand new premises with effect from 14th MAY 2018 Read more...
“We are committed to enhancing our company’s image and profile in the market place by addressing issues relating to corporate and social responsibility”
Moy House
69 Belvue Road
Northolt
Middlesex
UB5 5XS